Dlicious wrote:
Glad you got it running! And driving! Now its time to drop it!

I'm with ya already...here is my maint log so far. notice 7/24/08. will probably go one more click up front. will lower the rear when i drop the modified subframe in. i picked up an extra SA subframe to weld in the pivots. i already have an IRS trans and diag arms sitting in the garage. one problem arose...I found a notch i will most likely buy. So once the square is running good enough to drive all $$$ goes in to the notch.
7/18/2008 installed wheel cylinders, adjusted 009 for type3 setup.
7/19/2008 installed new brake hoses, bled brakes
7/20/2008 adjusted valves./ rough sync carbs set idle.
7/24/2008 rebuilt calipers, bled brakes,lowered front 2 clicks. undercoated wheel wells/cleaned fuel tank.
7/25/2008 installed fuel tank, hooked up fuel lines.
7/26/2008 installed og dist, timed final sync carbs.
7/31/2008 installed air filters
8/9/2008 changed oil/checked compression 1-132,2-140,3-148,4-132
8/14/2008 installed headers
8/16/08 installed muffler
8/17/2008 installed aluminum heat tubes. Removed axle's/trans from IRS subframe.
8/22/2008 installed vacuum advance,hose, fixed vacuum leak on carb
8/23/2008 repaired all external lights.
8/24/2008 removed cracked windshield, found surface rust. started prep for new windshield.